Wyoming Department of Transportation
image-from-the-document-manager-6

Fuel tax project will serve to resurface US 20 through Wind River Canyon tunnels

Date: 12/13/2013 

10:02

A $369,000 project, awarded to 71 Construction of Casper by the Wyoming Transportation Commission during its December meeting, will benefit a 0.3-mile section of US 20. The work consists of pavement rehabilitation, mostly milling and resurfacing work, through the three US 20 tunnels at the south end of Wind River Canyon between Shoshoni and Thermopolis. The work should be complete by July 31, 2014.

Back to news list
Back to Top