A: Chargers operate at three levels, which deliver power at different speeds.

Most programs, including NEVI, are focused on Level 3/Direct Current Fast Chargers (DCFC).
While in Level 2 chargers are common, WYDOT only permits a maximum of two level 2 charging ports at a NEVI-funded station.
The most common type of connectors are the Combined Charging System (CCS) connectors, with the Tesla North American Charging Standard (NACS) charger becoming increasingly common.
A: You can find information about the National Electric Vehicle Infrastructure program here. You can find a list of available other grants here. WYDOT only lists grants available from federal agencies that the department regularly works with. You may find other grants at grants.gov.
A: EVs will be given no special treatment. Much like gas-powered vehicles, drivers will need to plan ahead for proper fuel stops and will need to watch the weather closely as they travel.
A: No, currently WYDOT does not have exact numbers of out-of-state EV usage.
A: Currently, drivers with EVs registered in Wyoming pay a road maintenance fee through an annual decal as part of their vehicle registration each year. In 2025, WYDOT began collecting fuel tax from Level 2 and 3 EV Charging Stations. As of July 2026, WYDOT's Fuel Tax Administration team has adjusted EV Charging Station fuel tax collection to align with changes to statute. Learn more specific information on the Fuel Tax webpage.
A: We recommend checking this webpage for toolkits, EV usage studies and other helpful documents. Interested groups are also encouraged to sign up for our EV Stakeholder database here. The database helps connect stakeholders, including landowners, EV charging infrastructure manufacturers, and more.
A: Yes! Some of WYDOT’s partners include the National Park Service, local utility companies, local nonprofits like Yellowstone-Teton Clean Cities and more.
A: These are highways that are part of a national network of corridors that support alternative fueling infrastructure. This initiative was established in July 2016, when the Federal Highway Administration called on states to nominate national plug-in EV charging, hydrogen, propane, and natural gas fueling corridors along major roadways as a part of the Fixing America's Surface Transportation Act. The AFCs in Wyoming are Interstates 25, 80 and 90.
A: Wyoming is set to receive $26.8 million over five funding years (FY2022-2026). The program will pay up to 80 percent federal cost share of the eligible costs, up to a maximum of $800,000 in federal dollars per NEVI site, which includes operations and maintenance. The minimum required match is 20 percent from non-federal sources. WYDOT will not be owning or operating EV charging stations.
A: WYDOT will not own, operate or maintain EV charging stations. WYDOT's role in NEVI is infrastructure planning and ensuring funding is properly spent within the state.
A: FHWA requires that the NEVI Program funds are first spent on the federally designated Alternative Fuel Corridors. In Wyoming, I-80, I-25, and I-90 are AFCs. Since FHWA deemed WYDOT met this requirement in the state's most recent NEVI Plan, WYDOT will now focus NEVI funding to non-interstate routes.
A: Charging stations meeting NEVI requirements must provide Level 3 (Direct Current Fast Charging) service capable of supporting four vehicles charging simultaneously with 150 kW of power.
A: No, the Federal Government does not allow the commercialization of federally-supported rest areas. Wyoming's rest areas are federally supported.
A: Please call 307-777-4381 to sign up for our EV stakeholder email list, where you'll receive email updates about the Wyoming NEVI Program and other EV grants available.
A: WYDOT issued a Request for Proposal to solicit bids for EV charging stations in October. Learn more about the RFP here.
A: The program will pay up to 80 percent federal cost share of the eligible costs, up to a maximum of $800,000 in federal dollars per NEVI site, which includes operations and maintenance. The minimum required match is 20 percent from non-federal sources.To see eligible costs, check out the NEVI rules linked on our webpage.
A: Yes, BABA requirements apply to the obligation of NEVI Formula Program funds. Check the Federal Register for the latest update on the BABA waiver.
A: Yes, Costs to acquire and install on-site electric service equipment (e.g., power meter, transformer, switch gear) are eligible. Costs for minor grid upgrades are also eligible, provided the work is necessitated solely by the construction or upgrading of the EV charging station and participation in the upgrade does not exceed the allocable cost of the minimum upgrades needed to match the planned power requirements of the EV charging station.
A: If you are a potential EV charging site host, equipment manufacturer, charging services provider, electrical contractor, utility, or provider of other services and would like to be included in the NEVI database please click here. You can see database entries here. For additional planning resources, click here.
A: Please call 307-777-4381 to sign up for our EV stakeholder email list, where you'll receive email updates about the Wyoming NEVI Program
WYDOT included this map in its 2025 NEVI plan to show the AFCs have enough charging stations to support full build-out status. This map is current as of September 2025.