Wyoming Department of Transportation



BRASS-SPLICE™ : Version 4.3  April 2015

This program designs splices using the Ultimate Strength Analysis (LFD) portions of the AASHTO Standard Specifications for Highway Bridges, 17th Edition, 2002, the AASHTO LRFD Bridge Design Specifications, 7th Edition, 2014, with 2015 Interim Revisions and Wyoming Department of Transportation Bridge Program design practice.


This will design field splices for rolled beam or welded plate steel girders. Design criteria used in this program are in compliance with AASHTO specifications and WYDOT design practice. The program uses a Windows graphical user interface for data input and produces a formatted text-based report and detail drawing of the resulting splice design.



Operating System Microsoft Windows™ XP (SP2 or SP3), Vista, 7, 8 or 8.1.
Microprocessor Pentium IV or higher
Microsoft .NET Framework 4.0
Memory 16 MB required, more is better
Hard Disk Space Approximately 36 MB
Disk Drive DVD drive



Back to Top